

Early production systems
MOBILE EARLY PRODUCTION SYSTEMS. OILTEAM SOLUTIONS
Application:
- Early field development
- Crude oil and gas treatment to spec quality
- Knock-out, treatment of formation water and establishment of reservoir pressure maintenance systems
Packages, as an element of the "digital field" system, perform a function of oil and gas wells testing (collecting, processing and transferring data) including production rates and data from downhole gauges.
Areas of application:
- New fields at the stages of exploration and early production
- Fields with small and unconventional reserves
- Brown fields with high watercut
Main advantages:
- Much less investment in projects compared to conventional surface infrastructure
- Elimination of risks associated with reserves overestimation
- Agile design on the basis of unified process modules (4... 6 weeks)
- Time efficient installation supervision and pre-commissioning activities (1-2 weeks)
- Simplified logistics through the use of self supporting load-bearing structures
- Of 1AA (1AAA, 1CC) form factor, container type (sea container 40...20 ft)
- High adaptability of the packages to changing geological field conditions
- Possibility to reuse them at different wells and fields
STANDARD PROCESS UNITS
Extended well tests | wells testing systems up to 3000 bpd ![]() |
Early production | separation and truck loading systems up to 6000-15000 bpd![]() |
Growth of fluid production | initial water knockout units up to 9000-18000 bpd![]() |
Growth and sustainable oil production | spec oil treatment systems 10000-2000 bpd and more![]() |
Water-cut increase | well pad free water separation and injection units (FPM)![]() |