rus eng

Application

Contact person
Email
Phone
Company(not necessary)
Comment
Apply

Course registration

Course
Training dates
Number of trainees(not necessary)
Contact person
Phone
Email
Company(not necessary)
Comment(not necessary)
Register

Quick contacts

OILTEAM

Phone

+7 (3822) 660130
+7 (3822) 900307

Email

oilteam@tomsk.oilteam.ru

Адреса

Management Company:
Tomsk, 3 Televisionniy Lane,
Service division:
Tomsk, 3 Razvitiya
Fluid lab:
Tomsk, 8 Razvitiya

Phone

+7(347) 2629899,
+7 (862) 2-255-447

Email

oilteam@oilteam.ru

Адреса

g.Ufa, Kommunisticeskaa 116,
g. Soci, pr. Kurortnyj, 92/5

Phone

+7 (3822) 66-01-30

Email

oilteam@tomsk.oilteam.ru

Адреса

g. Tomsk, pr. Razvitia, 3

Phone

+7 (3822) 66-01-30

Email

oilteam@tomsk.oilteam.ru

Адреса

g. Tomsk, pr. Razvitia, 8

Phone

+7 (3476) 12-65-18

Email

oilteammash@oilteammash.com

Адреса

g. Kumertau, selo Maacnyj, ul. Zeleznodoroznaa, d. 3 kor. 2

Phone

+7 (862) 2-255-447

Email

oilteam@oilteam.ru

Адреса

g. Soci, pr. Kurortnyj, 92/5

Phone

77777

Email

Другие направления

Адреса

Drugie napravlenia

View all contacts
Новости

Early production systems

MOBILE EARLY PRODUCTION SYSTEMS. OILTEAM SOLUTIONS



Application:

  • Early field development
  • Crude oil and gas treatment to spec quality
  • Knock-out, treatment of formation water and establishment of reservoir pressure maintenance systems

Packages, as an element of the "digital field" system, perform a function of oil and gas wells testing (collecting, processing and transferring data) including production rates and data from downhole gauges.

Areas of application:

  • New fields at the stages of exploration and early production
  • Fields with small and unconventional reserves
  • Brown fields with high watercut

Main advantages:

  • Much less investment in projects compared to conventional surface infrastructure
  • Elimination of risks associated with reserves overestimation
  • Agile design on the basis of unified process modules (4... 6 weeks)
  • Time efficient installation supervision and pre-commissioning activities (1-2 weeks)
  • Simplified logistics through the use of self supporting load-bearing structures
  • Of 1AA (1AAA, 1CC) form factor, container type (sea container 40...20 ft)
  • High adaptability of the packages to changing geological field conditions
  • Possibility to reuse them at different wells and fields

STANDARD PROCESS UNITS

Extended well tests wells testing systems up to 3000 bpd

Early production separation and truck loading systems up to 6000-15000 bpd

Growth of fluid production initial water knockout units up to 9000-18000 bpd

Growth and sustainable oil production spec oil treatment systems 10000-2000 bpd and more

Water-cut increase well pad free water separation and injection units (FPM)