

Equipment
Mobile separation and truck loading system
Basic info
Extended well testing and early production
Preliminary treatment of produced fluids, metering, storage, loading or export pumping
Gas utilization for power generation
Mobile separation and truck loading system
Purpose and advantages:
- Extended well testing and early production
- Preliminary treatment, metering, storage, loading or pumping
- Gas utilization for power generation
Equipment configuration:
- Manifold module (1)
- Two-phase or three-phase separator (2)
- Storage tank module (3)
- Pump module (4) or truck loading station (5)
- Horizontal or vertical flare unit (6)
- Gas power plant and stand-by diesel generator (7)
- Operator room (8)
- Instrumentation and controls
- Piping and cable connections
Flow rate, bpd | up to 3000-6000 (and more) |
Gas flow rate, Sm³/d | up to 250 000 (and more) |
Measurement accuracy of mass flow rate | accuracy of measuring ± 2,5% mass. |
Measurement accuracy of volumetric gas discharge | measuring accuracy ± 5% |
Input pressure (design), bar | 16; 25; 40; 63; 100; 160 |
Ambient temperature, ⁰С | from -60 to + 50 |