rus eng

Application

Contact person
Email
Phone
Company(not necessary)
Comment
Apply

Course registration

Course
Training dates
Number of trainees(not necessary)
Contact person
Phone
Email
Company(not necessary)
Comment(not necessary)
Register

Quick contacts

OILTEAM

Phone

+7 (3822) 660130
+7 (3822) 900307

Email

oilteam@tomsk.oilteam.ru

Адреса

Management Company:
Tomsk, 3 Televisionniy Lane,
Service division:
Tomsk, 3 Razvitiya
Fluid lab:
Tomsk, 8 Razvitiya

Phone

+7(347) 2629899,
+7 (862) 2-255-447

Email

oilteam@oilteam.ru

Адреса

g.Ufa, Kommunisticeskaa 116,
g. Soci, pr. Kurortnyj, 92/5

Phone

+7 (3822) 66-01-30

Email

oilteam@tomsk.oilteam.ru

Адреса

g. Tomsk, pr. Razvitia, 3

Phone

+7 (3822) 66-01-30

Email

oilteam@tomsk.oilteam.ru

Адреса

g. Tomsk, pr. Razvitia, 8

Phone

+7 (3476) 12-65-18

Email

oilteammash@oilteammash.com

Адреса

g. Kumertau, selo Maacnyj, ul. Zeleznodoroznaa, d. 3 kor. 2

Phone

+7 (862) 2-255-447

Email

oilteam@oilteam.ru

Адреса

g. Soci, pr. Kurortnyj, 92/5

Phone

77777

Email

Другие направления

Адреса

Drugie napravlenia

View all contacts
Register Timetable News

Lecturers

Marat NukhaevMSc in Petroleum Engineering


Over 10 years of experience in the oil industry in technical positions: operating and service companies. Experience in various stages of field development in almost all regions of Russia, Central Asia and the Middle East. This experience includes work in the field (as a field engineer for ESP), research and development (as a senior research scientists), operating company (reservoir engineer), oil service company (on the position of production engineer, completion domain, completion technical sales representative), university (associated professor). Involvement into all stages of well completion planning, design and well construction: preliminary reservoir simulation to take into account particular type of well completion, completion design for certain reservoir properties and production requirements, real time horizontal well completion design based on the wireline data or LWD data, TAD modeling for liners running to the hole, as well as following up well production monitoring (via distributed temperature sensors, PLT etc) and performance analysis of completion equipment. Experience with various types of collectors (sandstones, carbonates, fractured and thin bed reservoirs, depleted reservoirs and reservoirs with abnormally high pressure); various types of fluid (high-viscosity oil, light crude oil, gases and gas condensates). Experience in projects with non-conventional hydrocarbons.